Showing posts with label round up. Show all posts
Showing posts with label round up. Show all posts

Wednesday, January 25, 2012

January, where have you gone?

It may sound bad, but I really have no idea where this past month has gone. It's the 25th already, and I'm still working on my first January sock, have not woven at all, and am not nearly done with my January Aran. What I have been doing, I think, is trying to get back in the groove after the holidays.

I have been swimming 3 times a week, working my way back up to a mile. I have started doing yoga again, adding one more sequence from my favorite dvd each time. I have been teaching my first knitting class in a long long time and thoroughly enjoying it. I have been doing blocking and finishing work for other people, and some knitting on commission. I have been cleaning up in the living room (found 2 fleeces shoved in the corner I completely forgot about, how could I not see them?). I knitted 100+ rounds on the Scheherazade I rescued from the UFO basket. I have knitted 17" of the body of the January Aran. I did knit a tiny doily and start knitting a small doily I've had my eye on for a while. I have been baking regularly, working a little, sleeping well. Not bad, all told, if you look at the proper criteria.

Here's a link that's too cool not to share: Knitting her CoWorkers


Wednesday, December 1, 2010

December Round Up

I've been making progress on my project pile, in one way or another. First, the sad news.

This afternoon, I bid farewell to Heere Be Dragone. I pulled it out to take pictures in hopes that it might motivate me, but when I took the meager 20-odd rows out of the bag, I saw that it had been chewed up all along one edge. Upon closer inspection, I saw a centipede-looking thing crawling around in the bag. Ugh. The skeins got shaken out outside and placed in a ziplock bag in the freezer. I took the chewed up bit off the needles and threw it away outside. Don't know when I'll pick that pattern up again, but it probably won't be anytime soon.
The good news is, of the 15 WIPs I found in October, only 7 remain on the needles. I finished the Noro Silk Garden Sock ZigZag Scarf yesterday. It came out a little shorter than I had hoped, so I "blocked" it by pinning it up to dry by one of the end points. I like the way the corners fold, nice and leafy. I would like to see it with smaller squares (that would make it longer, too). Next time I'm in a domino mood I'll pick up another skein and give it a go.

I did like the yarn, but I would never knit socks with it. It is a loosely twisted single with a very variable diameter. Great for accessories, but seeing "sock" in the name is, I feel, misleading.

On the subject of socks, it is now December so I can start my self-imposed sock club selection for the month. I'm knitting Rough Weather from Think Outside the Sox in a skein of Lion Brand Magic Stripes that I've had sitting around for a really, really long time. Since before I found real yarn shops to buy yarn in. I've made a pair of socks from this yarn before, it's not bad but not my first choice. A little on the thick side, and a bit fuzzy but durable and soft and warm. This pair will be for Tara since she loves the colorway, Lumberjack Black. If I knit fast enough, she may even get them for Christmas.

Sunday, October 24, 2010

and one more...

...but only because I was rooting through everything, looking for things that need to be tagged for the HGB Annual Sale. It was in a tote in the hall bathroom (long story) in a basket with a couple of totes containing just yarn. So, what I feel (almost) sure is the last project on the needles:

15) Heere Be Dragone, cast on several years ago. I knitted 20 or so rows and got distracted.

Scary how that phrase keeps popping up. I feel like I almost always finish what I start, or at least officially give up and frog it, but apparently that's not the case. I did , however, finish #12 on my list last night, the red Morgana fingerless gloves. I did the cuff on Friday night while we were watching Weird US Volume 3. Grafted the cuff and knitted the hand last night during Octopussy (good Bond movie, creepy title). So now I have 7 pairs in various colors to go into the sale on November 1. Yay!



The color is off, it's been cloudy here and I've had to rely on flash. They are a nice clear red, not the pumpkin color you see here. Even though I put this down at the end of the summer, I've knitted so many pairs of these that I didn't need to look at the pattern. I think it's permanently burned into my brain. ;) But I now have a pair to go with each jacket or sweater, and my kids all have a pair, and they keep selling. Not bad for a couple of evenings and one ball of yarn.

About the whole yarn in the bathroom thing...over the summer, our plastic (not fiberglass, but PLASTIC) bathtub started to crack in several places, leaking water to the underside of the tub and out into the room. We hired Robin to remove the tub and see if the subfloor needed to be replaced. Luckily it does not, but we don't have the funds to put a new tub in yet. So there is this large, rectangular space where the tub used to be, sitting there serving no purpose.

At the same time, Milly wound up with 26 totes of yarn from a friend of a friend who decided she's not going to knit anymore. One thing led to another and I wound up bringing 5 totes home. I sorted them and repacked them, putting some of the yarn I already had into the mix, and then I needed somewhere to put them. Well. Unless I want to move around this stack of totes all the time, or have to move it to do laundry, the only sensible place was the bathroom. It's only temporary, but for now it works. There's even room to move them around and look for yarn.

Kevin really misses taking tub baths so we will be getting a new tub soon, but I think I have time to at least begin knitting through some of this yarn. After a bit I'll know which ones I won't ever use and I can weed those out too.

Thursday, October 21, 2010

I found another one!

Since yesterday's post, I unearthed two more projects that I'd forgotten about .

13) Anarchist sweater from my friend Stephanie's handspun I cast on about a year ago. I knitted 1-1/2 strips and got distracted.

14)  A knitted handbag of my own devising that only needs to be felted and given a strap. Not sure why I put this one aside, there don't appear to be any problems. Once I get to that point, I'm usually pretty jazzed to see it all done.

And a box of yarn arrived today. I ordered EZ's Green Sweater kit last week, so that will be stirred into the mix soon. I wonder what I'll uncover tomorrow.

Wednesday, October 20, 2010

Startitis!

I know I already have plenty on the needles, but this past week I've cast on more. Spent the entire weekend (for all practical purposes) knitting an hour or two on this, then doing a fast, easy chore and knitting an hour or two on something else.

Off the top of my head, here's the list:

1) Scheherazade stole, a little more than halfway done but currently buried under
2) Knitted lace ornaments, with the glass balls and the charts from last year and the yarn and everything in a big plastic box.
3) February Lady, knitted to a bit below the armholes
4) Fairies and Flowers is more than halfway done, but I only ever knit one chart repeat at a time.
5) Funny and Fancy from Think Outside the Sox, halfway through the second cuff
6) Noro zigzag scarf I'm knitting off the top of my head. Have about 8 squares, need about 20.
7) Lace Mohair baby blanket I'm knitting for community knitting at Mew Mews. I only knit on it at community knitting, though, so it's slow going.
8) Sojourner in purple! Just got the yarn last week and have about 1-1/2" so far. Did I mention it's purple?
9) Cable Luxe Tunic for Tara. Bought the pattern and yarn at least a year ago, maybe 2. Cast on over the weekend.
10) black Ogre Slippers for Finn. I've made 3 pairs so far. Knitted past the heel of one over the weekend
11) Tara's brown cable vest, a special request. She picked out some cables she likes, actually all of the cables in St Brigid from Aran Knitting, and I did the math and swatched for a vest that would fit tiny her. Almost halfway through the ribbing.
12) red Morgana fingerless mittens that I started over the summer. Made one and haven't touched the bag since.

Well, that's not as bad as I'd feared, actually. A dozen projects, I can live with that! I was thinking there were about 20. It does seem like more when the bags are piled up by my knitting spot in the living room. Seemed like I saw the word "half" a lot, though. Pics tomorrow if all goes well.